Since 2019 KUNC-CONSULTING Perg (Austria),
Consultant Hydro Power
- Kainji Hydro Power Plant, Nigeria
Rehabilitation of the existing hydro power scheme (750MW)
see moreDesign review and Design Approval of all hydromechanical equipment and factory acceptance tests of intake equipment such as servomotor and HPU. Preparation of tender documents and specifications for hydro-mechanical equipment.
Role: Consultant Design Engineer Hydro-Mechanical Equipment
- Jebba Hydro Power Plant, Nigeria
Rehabilitation of the existing hydro power scheme (578MW)
see moreDesign review and Design Approval of spillway structure and project execution of spillway rehabilitation works.
Role: Consultant Design & System Engineer Spillway Gates
- Schils Hydro Power Plant, Switzerland
Rehabilitation of the existing hydro power scheme (8,5MW)
see morePreparation of tender design, documents and specifications for all hydro-mechanical equipment and optimization of hydro-mechanical concept.
Role: Consultant Design Engineer Hydro-Mechanical Equipment
- Luang Prabang Hydro Power Plant, Laos
New development of a hydropower scheme development (1.400MW)
see moreDesign review and Design Approval of all hydromechanical equipment and factory acceptance tests of intake equipment such as servomotor and HPU. Preparation of tender documents and specifications for hydro-mechanical equipment.
Role: Consultant Design Engineer Hydro-Mechanical Equipment
2017 to 2019 ANDRITZ HYDRO Linz (Austria),
Sales Manager Large Hydro Penstock and Gates
- 2019 – Komani Hydro Power Plant, Albania
Rehabilitation of the existing hydro power scheme (624MW)
see moreEmergency repair of the two spillway bays radial gates. In total seven gates to be completely renewed. Stoplogs and embedded parts to isolate the gates were not foreseen at the original layout of the plant and were considered to be installed by divers during the project execution. Very complex underwater works in a depth of approx. 20m.
Role: Technical Project Manager Proposal Phase
- 2018 – 2019 – Muzizi Hydro Power Plant, Uganda
New development of a hydropower scheme development (45MW)
see moreOffered hydro-mechanical package including the intake structure, spillway structure, penstock, bifurcation and draft tube gates. In a consortium with a civil partner the new plant consisting of a concreted dam, a more than 3km long penstock, powerhouse and outlet channel was developed and optimized.
Role: Technical Project Manager Proposal Phase
- 2018 – Nangbeto Hydro Power Plant, Togo
Rehabilitation of the existing hydro power scheme (65MW)
see moreThe hydro-mechanical package included the rehabilitation of the intake steel structure, the steel lining, the bottom outlet and the spillway structure. Temporary stoplogs had to be placed in front of the bottom outlet by means of divers.
Role: Technical Project Manager Proposal Phase
- 2018 – Baroota Pumped Storage Plant, Australia
New development of a hydropower scheme development (270MW)
see moreAfter passing the tender stage this project was developed with a civil partner in an early contractor involvement phase (ECI). The hydro-mechanical scope included the upper and lower intake structure and the draft tube gates.
Role: Technical Project Manager Proposal Phase
- 2018 – Snowy Pumped Storage Plant, Australia
New development of a hydropower scheme development (2.000MW)
see moreThis offer to a civil company included the entire hydro-mechanical package, including the upper & lower intake steel structure, the steel lining, penstock rupture butterfly valve and the draft tube gates. The layout of the waterways and intakes was optimized in close cooperation between the civil company, the company supplying the HM equipment and a consulting company.
Role: Technical Project Manager Proposal Phase
- 2018 – 2019 – Kidston Pumped Storage Plant, Australia
New development of a hydropower scheme development (250MW)
see moreAfter passing the tender stage this project was developed with a civil partner in an early contractor involvement phase (ECI). The hydro-mechanical scope included the upper and lower intake structure and the draft tube gates.
Role: Technical Project Manager Proposal Phase
- 2017 – 2018 – Goat Hill Pumped Storage Plant, Australia
New development of a hydropower scheme development (250MW)
see moreThe hydro-mechanical offer included the upper and lower intake structure, the penstock, the draft tube gates and the spillway structure.
Role: Project Manager Proposal Phase
2010 to 2017 ANDRITZ HYDRO Vienna & Linz (Austria),
Head of Service & Rehabilitation Department Linz & ANDRITZ HYDRO Vienna (Austria),
Proposal & Project Manager
- 2015 – 2017 – Aratiatia Hydro Power Plant, New Zealand
Modernisation of the existing hydro power plant scheme (94MW)
see moreThe scope of works to be executed comprised of the rehabilitation of the existing three low head Francis runner units and the delivery and installation of three new generators and associated equipment.
Role: Overall Technical Project Manager Execution Phase
- 2013 – 2017 – Komani Hydro Power Plant, Albania
Modernisation of the existing hydro power plant scheme (624MW)
see moreThe scope of works comprised of the rehabilitation of all unit related items and common equipment. The plant is equipped with four 156MW Francis runner units.
Role: Overall Technical Project Manager Execution Phase
- 2010 – 2013 – Kindaruma Hydro Power Station, Kenya
Rehabilitation and upgrade of the existing two units and extension of the plant by one unit (72MW)
see moreThe scope of works comprised of the implementation of a new propeller type unit into the existing civil structure and the rehabilitation of the two existing Kaplan units where the generators and associated equipment were delivered and installed as new components.
Role: Overall Technical Project Manager Execution Phase
2009 to 2010 ANDRITZ HYDRO Beijing (China),
Design Engineer
- 2009 – 2010 – Theun Hinboun Power Plant, Laosa
New development of a hydropower scheme (500MW)
see moreThe scope during project execution phase out of China mainly consisting of mechanical balance of plant.
Role: Design Engineer and Design Coordinator
- 2009 – New Bong Escape Hydro Power Project, Pakistan
New development of a hydropower scheme (84MW)
see moreThe scope during project execution phase mainly consisting of manufacturing of spherical valve in China.
Role: Design Engineer and Manufacturing Supervisor MIV
2004 to 2009 ANDRITZ HYDRO Linz (Austria),
Design Engineer
- 2008 – 2009 – Pirris Hydro Power Plant, Costa Rica
New development of a hydropower scheme (134MW)
see moreThe scope of work during execution comprised of the entire EM and HM package of the plant.
Role: Design Engineer Penstock & Pelton Runner
- 2008 – Kandil Cascade Hydro Power Plants, Turkey
New development of a hydropower scheme consisting of three plants
see moreThe scope of work during execution comprised of the entire EM and HM package of all three plants.
Role: Design Engineer MIV
- 2008 – Varahi Hydro Power Plant, India
New development of a hydropower scheme (62MW)
see moreThe scope of work during execution comprised of the EM package.
Role: Design Engineer Butterfly Valve
- 2007 – Feldsee Pumped Storage Project, Austria
Extension of the existing high head hydropower plant to a pumped storage scheme (70 MW)
see moreThe scope of work during execution comprised of the EM package.
Role: Design Engineer Butterfly Valve
- 2006 – 2007 – Rock Island Rehabilitation Project, U.S.A.
Modernisation and upgrade of the existing river power plant (113MW)
see moreThe scope of work during execution comprised of the EM package of one unit including new deliveries such as the runner, generator and associated equipment. Increase of the unit output due to installation of a steel made ”splitter vane” at the concreted draft tube structure to reduce losses there.
Role: Design & System Engineer Steel Structure
- 2006 – Hintermuhr Pumped Storage Project, Austria
Extension of the existing high head hydropower plant to a pumped storage scheme (67MW)
see moreThe scope of work during execution comprised of the EM package.
Role: Design Engineer Butterfly Valve
- 2006 – Ermenek, Turkey
New development of a hydropower scheme (300MW)
see moreThe scope of work during execution comprised of the entire EM and HM package of the plant.
Role: Design Engineer Hydraulic Steel Structure
- 2005 – Gerlos II, Austria
Extension of the existing high head hydropower scheme (135MW)
see moreThe scope of work during execution comprised of the HM and EM package of the plant.
Role: Design Engineer Spherical Valve
- 2004 – Middle Marsiangdi, Nepal
New development of a hydropower scheme (72MW)
see moreThe scope of work during execution comprised of the HM and EM package of the plant.
Role: Design Engineer Hydraulic Steel Structure
- 2004 – Tsankov Kamak, Bulgaria
New development of a hydropower scheme (80MW)
see moreThe scope of work during execution comprised of the HM and EM package of the plant.
Role: Design Engineer Hydraulic Steel Structure